Warsaw Central Station Shut Down Nov 8‑16; Trains Routed Through Gdańska

Warsaw Central station will be shut down from November 8‑16 2025, with all trains rerouted through Warsaw Gdańska, officials say.

Closure of Warsaw Central Station

From November 8 to 16, 2025, Warsaw Central station will be temporarily decommissioned.

During that week, no long‑distance or regional trains will pass through the hub.

Rerouting Through Warsaw Gdańska

All traffic will be redirected to the Warsaw Gdańska station.

Certain services will terminate at other stations along the line.

Suspension of Transit Traffic

The vice‑minister announced that no transit trains will operate through the station at all during the closure.

Planned Upgrades and Future Expansion

Works at Warsaw Central aim to prepare for the overhaul of the city’s main line and to increase node capacity.

Q4 plans include building a “trapez” on the eastern side and renovating traffic control systems between Warsaw West and Warsaw East.

Impact on Passengers

Travelers will need to use a different central station and expect timetable adjustments by operators.

Detailed train schedules for the period will be released by operators and the infrastructure manager.

Total
0
Shares
Leave a Reply

Your email address will not be published. Required fields are marked *

Previous Post

Krasznahorkai Receives 2024 Literary Nobel

Next Post

Eight Suspects Arrested Over Unlawful Money Demands in Lublin Region

Related Posts