Trams operators must complete the Pawińskiego Street crossing repair before trams resume the Banacha loop in December, blocking the junction on Sunday, 30 November and rerouting bus line 186.
Repair Details
Tram operators must repair the crossing on Pawińskiego Street before trams return to the Banacha loop in December. On Sunday, 30 November, the street will be disconnected from Banacha, and bus line 186 will be rerouted.
Work Schedule and Scope
During the works the damaged crossing surface will be replaced with asphalt and the tracks will be realigned. The project starts Saturday night from 29 to 30 November and continues through Monday, 1 December, until 4:30 a.m.
Access Restrictions
The crossing at Pawińskiego with Banacha will be closed; no entry or exit from Pawińskiego is allowed. At Banacha, from the Żwirki i Wigury side, drivers must turn right onto Wolna Wszechnica. The roundabout at Pasteur remains open.
Detour Routes
Traffic can avoid the closed junction via Dickensa, Księcia Trojdena and Żwirki i Wigury streets.
Bus 186 Route Adjustment
On Sunday, buses of line 186 will reach the Banacha stops using Księcia Trojdena and Żwirki i Wigury streets.



