A broken heating pipe on Zawadowskiego street on Sunday night cut off heating and hot water to 75 buildings in Ursynów, with supply expected to resume by 8 a.m. on Tuesday.
Outage Details
Veolia Energia Warszawa S.A. confirmed a failure in the district heating network, which has halted deliveries from 30 November 2025 at 10 p.m. until 2 December 2025 at 8 a.m.
Affected Areas
The outage impacts homes and larger blocks near Zawadowskiego, Puławska, Poleczki, Poloneza, Taneczna, and surrounding streets. A full list of buildings includes addresses on Giewont, Granitowa, Hołubcowa, Mączeńskiego, Osmańska, Paszkiewicza, Poleczki, Polki, Poloneza, Puławska, Rysy, Salsy, Surowieckiego, Taneczna, Wyścigowa, Zaolziańska, Zaorskiego, and Zawadowskiego.
Operator Statement
Veolia issued an official notice detailing the interruption and supplied a comprehensive roster of affected buildings.
Impact on Residents
Residents across the affected area will experience no heating or hot water until the fault is repaired and services are restored.
Environmental Effect
During fault localisation, water containing the dye fluorescein leaked onto the surface, staining the Służewiecki stream.



